PROVIDER COMPARISONS →  ·  2026-11-10 · 14 min read

Monetize idle GPUs, honestly: marketplace, colocation — or sell the card

Every guide to renting out your GPU starts at the signup button. This one starts at the arithmetic. What an idle card earns is decided by three numbers nobody can promise you — how many hours it rents, what the platform keeps, and what your power costs — so this page works all three openly, at rates verified on Nov 10, 2026, and then gives the option the funnel guides leave out: sometimes the best way to monetize an idle GPU is to sell it.

The verdict

  • One consumer card at home — List it on a host marketplace — and run the sell comparison below first. About $84–$146 a month after power at 40–70% utilisation, worked in full below. Selling the same card today brings roughly $2,400–$2,800 once — renting takes well over a year to match it.
  • A few gaming cards — Marketplace, all of them — colocation maths does not work at this size. The same per-card maths, times the cards: roughly $84–$146 per 4090-class card per month after power. Your real cost is babysitting uptime across several machines.
  • 8+ datacenter cards — Colocation, or a host programme — the facility contract comes first, the listing second. An 8× H100 node grosses $13,140 a month at the best verified node rate if rented every hour — and about $5,060 after power alone at 40%, before the fixed facility bill. The bill is owed whether the node rents or not.
  • An enterprise fleet — Contract / colocation at negotiated rates — you are running a small cloud, price it like one. No honest per-card net exists here: it is your negotiated facility cost against your booked utilisation. For scale, Spheron’s own cost model puts colocation plus networking at roughly $73 per GPU per month on a 1,024-GPU cluster (their figure, stated Oct 2026) — a small fleet pays more.

The three routes, without the funnel

Every “net” figure here is worked step by step below — gross at three utilisation levels, minus power — where a platform takes a host-side cut, that depends on the model and is handled in the fee section. Nothing here is an earnings promise; utilisation is the renter’s decision, not yours. Route 1 — list on a marketplace that takes hosts. You install the platform’s software, pass its verification, set or accept a price, and renters find you. The platform handles the customer, the billing and the metering, and takes its side of the money — how much, and taken from whom, differs by platform and gets its own section below. Your costs are power, wear, and keeping the machine online. This is the only route that makes sense below a rack of hardware. Route 2 — colocation. You rent rack space, power, cooling and bandwidth in a data centre, put your machines in it, and list them yourself (or through a marketplace on top). The facility bill is fixed and monthly: it arrives at 100% whether your machines rent at 100% or at zero. Colocation buys the density and uptime a home connection cannot offer — an 8-GPU node wants kilowatts, not a wall socket — and only pays once the fleet is big enough that the fixed bill is a small slice of the gross. Route 3 — sell the hardware. No funnel will suggest this, because nobody earns a commission when you sell your own card. It belongs in the comparison anyway: a used RTX 4090 sells today for roughly what 16–34 months of realistic renting nets (worked below), and the card at the end of two years of renting is worth less than the card today. Renting wins when you want the card kept, or genuinely believe utilisation will run high for years. Selling wins more often than the hosting guides admit.

The marketplace maths: one RTX 4090

Worked at the cheapest verified renter price for a 4090 hour on our board — $0.34/hr (RunPod Community, checked Nov 10, 2026). That is what a renter actually pays for this card today, so it is the honest rate for a host listing to compete at. A month is 730 hours. Power is the card alone at its rated 450W TDP, at an assumed $0.12/kWh — home rates vary widely, and the rest of the PC draws more, so treat the power line as a floor.

One RTX 4090, listed at $0.34/hrRented every hour (100%)70% of hours40% of hours
Rented hours in a 730-hour month730511292
Gross$248.20$173.74$99.28
Power while rented (450W × hours × $0.12/kWh)−$39.42−$27.59−$15.77
Net before any host-side platform cut$208.78$146.15$83.51

Two honest footnotes. First, the platform’s cut: on nafnaf’s model the 5% fee is added on the renter’s side, so a host asking $0.34 receives $0.34 and the renter pays $0.357 — the table stands as written there. On a platform that deducts from the host’s side, take that percentage off the gross line before power; the section below says which models we could verify. Second, a PC left on around the clock draws idle power too — at an assumed 50–100W (labelled assumption), roughly $4–$9 a month, owed whether or not a job ever lands.

The same maths at node scale: 8× H100

Datacenter cards rent as nodes. The best verified 8-GPU H100 rate on our board is TensorDock’s $2.25 per GPU per hour at an 8-GPU minimum — $18.00 per node-hour (checked Nov 10, 2026). Power is the eight cards alone at the H100 SXM’s rated 700W TDP each — 5.6 kW, before CPUs, networking and cooling, so again a floor.

One 8× H100 node at $18.00/hr100%70%40%
Gross$13,140$9,198$5,256
Power while rented (5.6 kW × hours × $0.12/kWh)−$491−$343−$196
Net before facility bill and any platform cut$12,649$8,855$5,060

The node’s gross is just over fifty times the single 4090’s — and unlike the home card, the node has a landlord. The line missing from this table is the facility bill, and it is missing on purpose: there is no honest universal figure for it. It gets its own section, as a formula, below.

What the platforms take — verified, and what is not published

PlatformWhat it takes — and what it does not publish
nafnaf5%, charged to the renter, not deducted from you. nafnaf’s own provider pages (read Nov 10, 2026) state a 5% consumer fee on your rate: “Ask $1.00, receive $1.00; the renter pays $1.05.” You set the rate for compute, storage and transfer; operating costs and taxes remain yours.
Vast.aiNo host-side hosting fee since June 2024; the renter-side surcharge is not published. Vast’s own 2024 round-up says it “eliminated hosting fees entirely” in June 2024 and moved to “a more flexible internal surcharge model” — the price a host sets is the price the host earns, and Vast’s margin sits inside the price the renter sees. What that surcharge is, Vast does not publish; third-party write-ups quote everything from the mid-teens to 25%, which tells you they are guessing. Treat any exact Vast percentage on a blog as unverified — including, if we ever printed one, ours.
SaladCloudYou are paid in Salad Balance, not cash. Salad’s own documentation (read Nov 10, 2026) says owners earn rewards in Salad Balance, redeemed through its storefront for PayPal, gift cards, games and subscriptions; the rate on a job is set by the priority the customer chose, and Salad’s own FAQ states many providers earn $100–$200 a month — Salad’s figure, not ours, and its terms guarantee no earnings. Balance is worth less than the same number in cash: you can only spend it where Salad lets you.
Everyone elseCheck the current split before you list. Host programmes revise their terms, and a percentage from last year’s blog post is how hosts get surprised. The split, the payout currency, the minimum payout and the payout schedule are four separate lines in every host agreement; read all four.

One structural point matters more than any percentage: whether the fee comes off your side or is added to the renter’s. A fee added on top (nafnaf’s model, and Vast’s since 2024) leaves your rate intact but makes your listing look pricier to a comparing renter. What decides your month is never the fee alone — it is the fee model multiplied by the utilisation that platform actually delivers to a card like yours.

Colocation: the fixed bill, as a formula

Colocation is priced per kilowatt or per rack per month, negotiated per facility, per region, per power contract — Spheron’s own colocation guide concedes the same point, in its words that a colocation quote “is closer to a real estate lease than a cloud price list.” So this guide will not quote you a colo price. It gives you the only number that matters, computable the moment a facility quotes you:

The break-even formula
Break-even utilisation = your fixed monthly facility bill ÷ (your hourly rate × 730)

That is the share of the month your machines must rent just to cover the facility, before power and before any platform cut. Worked example with a clearly illustrative bill: at a facility bill of $1,500 a month (illustrative — get quotes; your market will differ) and the node’s $18.00/hr, break-even is $1,500 ÷ $13,140 ≈ 11% of hours to cover the facility alone, and roughly 12% once the node’s power margin is counted. Double the bill to $3,000 and break-even doubles with it, to about 23%. The formula is the deliverable: a quote you cannot run through it is a quote you do not understand yet. Two anchors, both labelled. Spheron’s own cost model for a 1,024-GPU H100 cluster (their post, figures stated as of early Oct 2026) itemises colocation and networking at roughly $75,000 a month — about $73 per GPU per month — with power billed separately. That is a thousand-GPU buyer’s number; a single-rack tenant has none of that leverage and should expect a far higher per-GPU cost, which is why route 2 starts at “8+ datacenter cards” above and not at two. And density is the gate before price: Spheron states GPU colocation runs 10–15 kW per rack as the 2026 baseline against 3–5 kW for standard server colocation — so a standard enterprise colo contract may not be able to power your rack at any price.

The 70% question, tested

Hosting content routinely models 70% utilisation or better, because the numbers look good there. Nothing about a marketplace promises it: utilisation is set by how many renters want your exact card, in your location, at your price, against every other identical listing — for a consumer card, thousands of them. Look at the same 4090 across the range, from the table above: $208.78 a month rented every hour, $146.15 at 70%, $83.51 at 40%. The card did not change; the assumption did, and it moved the answer two and a half times. Any earnings figure quoted without its utilisation assumption printed next to it is marketing, not maths.

Renting one RTX 4090What it takes — or what it pays
Match $2,400 in one yearNet about $200 a month — the card would need to rent about 96% of all hours for a year straight, against a ceiling of $208.78 a month if it rents literally every hour.
Match $2,800 in one yearAbout $233 a month — no utilisation level gets there at all at the worked rates.
24 months at 70% utilisationAbout $3,500 net before any host-side cut, against $2,400–$2,800 today — while the rented card ends those two years older, more worn, and worth less.

Now the comparison the funnel leaves out — renting against selling. A used RTX 4090 sold for roughly $2,400–$2,800 in recent completed eBay sales (sold-listing trackers read Nov 10, 2026; condition and model move the figure, and trackers disagree with each other — the method works with whatever your card would actually fetch). At the worked rates above, matching even the low end within a year means netting about $200 a month, against a ceiling of $208.78 if the card rents literally every hour: the card would need to rent about 96% of all hours for a year straight. Against the top of the range ($2,800, or $233 a month), no utilisation level gets there at all. Over two years the picture flips, but only just, and only at sustained high utilisation: 24 months at 70% nets about $3,500 before any host-side cut, against $2,400–$2,800 today — while the rented card ends those two years older, more worn, and worth less, and the $0.34 rate has to survive a market that has repriced everything else. The honest summary: renting a single 4090 is a reasonable way to keep a card you want anyway and offset its cost. As a pure investment against selling, it needs years and luck.

The demand is real — and it still is not a promise

The renter side of this market is genuinely tight, and our own record shows it. Providers do not raise prices twelve times into weak demand:

ProviderWhat our Price Watch record shows
VerdaA mid-size provider on our board — has raised its prices twelve times since Oct 23, 2026; its GB300 rate is up ▲ 16.1% since Oct 19 ($11.82 → $13.72/hr, both read on Verda’s own pricing pages on those dates).
RunPod ServerlessIts B200 rate rose about 25% between our Oct 26 and Nov 2 reads.
LambdaHas announced rises of about 15% taking effect Nov 16, 2026.

Hold the counterweight in the same hand. A rising list price at a datacenter provider is evidence renters pay more for capacity in facilities — it is not evidence that your specific card, in your specific postcode, beside thousands of identical marketplace listings, rents one hour more. Datacenter demand concentrates on datacenter cards in datacenter buildings; the consumer-card end clears at $0.34 an hour precisely because supply there is deep. Both facts are in our record. Quote either one alone and you are selling something.

When not to bother

SituationWhy it does not pay
One old or low-memory cardThe maths scales with the hourly rate; a card renting for a few cents an hour cannot outrun its own power bill, let alone your time.
Expensive home electricityEvery figure here moves with your power price. At double the assumed $0.12/kWh, the 4090’s 40% month nets about $68 instead of $84 — run your own rate through the table before listing, not after.
You cannot keep the machine onlineMarketplaces verify hosts, rank on reliability, and delist or bury listings that drop offline or fail jobs. A gaming PC that sleeps, updates and reboots on its own schedule is not inventory; it is a future delisting.
You need the money soon, or certainlyRental income is variable and starts at zero; a sale is one amount, once, now. If the point is a known sum by a known date, route 3 is the only honest answer.
The payout is not moneyBalance, credits and tokens are worth what the platform lets you redeem them for, when it lets you. Price that in before counting the earnings.

How we know

Rental rates are from GPUJournal’s verified price board, checked Nov 10, 2026 on providers’ own published pages and banked daily since Oct 19, 2026: RTX 4090 best verified offer RunPod Community $0.34/GPU/hr (RunPod Secure lists the same card at $0.89); 8× H100 node rate TensorDock $2.25/GPU/hr at an 8-GPU minimum, $18.00/node/hr. Platform terms were read on the platforms’ own pages on Nov 10, 2026: nafnaf’s provider pages state a 5% consumer fee added to the host’s rate (“Ask $1.00, receive $1.00; the renter pays $1.05”); Vast.ai’s 2024 round-up on vast.ai states hosting fees were eliminated in June 2024 in favour of an internal surcharge model whose percentage Vast does not publish — third-party percentages for Vast (mid-teens to 25% across the write-ups we found) conflict and are treated as unverified; Salad’s documentation states hosts earn Salad Balance redeemable via its storefront (PayPal, gift cards, games), that job rates depend on customer-set priority, and that many providers earn $100–$200/month (Salad’s own figure; its terms guarantee no earnings). Power figures are labelled planning assumptions: card draws are the manufacturers’ rated TDP (RTX 4090 450W, H100 SXM 700W), GPU only — whole-system draw is higher; electricity is an assumed $0.12/kWh; a month is 730 hours; idle draw of 50–100W is an assumption, not a measurement. The colocation worked example uses an explicitly illustrative facility bill of $1,500/month — no colocation price is quoted in this guide because none is published in a form we could verify; the $73/GPU/month colocation-and-networking figure and the 10–15 kW/rack density baseline are Spheron’s stated figures from its colocation post (stated as of early Oct 2026, read Nov 10, 2026), as are its supplier programme terms. Resale: two completed-eBay-sale trackers read Nov 10, 2026 (GetPCParts average ≈$2,387, sales through Nov 7, 2026; pcprice.watch median $2,780) — this guide uses the rounded range $2,400–$2,800, and the rent-vs-sell method works with any figure you substitute. Demand evidence is our own Price Watch record: Verda’s twelve rises, Oct 23 – Nov 10, 2026 (GB300 $11.82 read Oct 19 → $13.72 read Nov 10); RunPod Serverless B200 ($8.64 read Oct 26 → $10.79 read Nov 2); Lambda’s announced rises of Nov 6, 2026, effective Nov 16 — announced, not yet in effect, and not applied to our board.

Our reading

Our reading — interpretation, not fact. Everything in this box is GPUJournal’s judgement on the verified record above it; the record itself is in the tables and the method note. We sell nothing, list nothing and take no commission from any route on this page — which is more than the author of the guide this one answers can say. Spheron’s posts on this question (read Nov 10, 2026) walk a rack owner through GPU colocation and land where you would expect: colocate the facility, then let a demand marketplace — theirs — fill it. For a datacenter fleet that framing is mostly fair, and their supplier programme’s stated terms (you set prices, you sign your own contracts, they handle billing and settle monthly) are reasonable ones to compare against. But the funnel starts at rack owners because that is who it can sell to. It does not run a home card’s net after power, does not test the utilisation its route implies for a card like yours, its programme covers H100-class datacenter SKUs only, and “sell” does not appear as a route. Start from your situation instead: one card — marketplace, with the sell comparison run first; a rack or more — get colo quotes, run the break-even formula on each, and only then argue about which marketplace’s demand is worth its cut.

Related guides

GPU Pricing · 2026-10-29 · 7 min

TensorDock pricing explained: the cheapest H100 headline, and the 8-GPU catch

TensorDock's H100 rate — $2.25 per GPU per hour — is the lowest per-GPU price in our checks. It is also a price quoted at an eight-GPU minimum, which makes the real entry ticket $18.00 an hour. Neither fact cancels the other. This page prices the same jobs both ways, so you can see exactly when the headline saves you money and when it quietly multiplies your bill.

GPU Pricing · 2026-11-08 · 12 min

Power is the new GPU shortage: why powered land decides your rental price

GPU rental prices have been rising for six weeks, and the usual explanation — not enough chips — no longer fits. The chips exist. What is scarce is somewhere powered to plug them in: an energised building, on a grid connection, under a signed power contract. This page walks through the verified rises, shows why they point at power rather than silicon, and tells you what to ask before you rent capacity that has not been switched on yet.

Go deeper